Construction of Residencial Building, Sunil Nagar, Dombivli East.
Year : WIP
Construction of Residencial Building, Ganesh nagar, Dombivli West.
Year :WIP
Construction of Residencial bunglow, Plot no- RL 125, Midc, Dombivli East
Year : WIP
Construction Of BUILDING NO-1 & BUILDING NO-3. On Plot No. RX55/2, Gymkhana Road, MIDC Dombivli East.
Year :WIP
Construction Of R & D Bldg. On Plot No. B62, Wagle Estate, Thane
Year :WIP
Vertical Expansion of School Building (3rd , 4th floor & 5th Floor ) at Dombivli
Year :2023-24 & 2024-25
Construction of Society Bldg (Gr + 7th Floors) at Dombivli East
Year :2021-22 & 2022-23
Construction of Society Bldg (Gr + 7th Floors) at Dombivli East
Year :2021-22 & 2022-23
Construction of South Indian Association (SIA) College Building at Dombivli
Year :2019-20 & 2021-22
Construction of Bank Building at Dombivli.
Year :2018-19 & 2021-22
Construction of IT Park at Wagale Estate, Thane
Year : 2019-20 & 2021-22
Area of Bldg. 60m x 60m. Foundations, Plinth, RCC Structure, Brikwork, Ext./ Int Plaster, Gutter Waterproofing, Site Development, Road and Tremix work of 60,000 Sqft.
Year :2015-16
Construction of CNG Pump
Construction of IT Park at Wagale Estate, Thane
fabrication & Erecation of fire Escape staircase
Construction of Factory Building at Dapoli
Construction of School Building
Construction of South Indian Association (SIA) College Building at Dombivli 21,000 Sqft
Area of Bldg. 60m x 60m. Foundations, Plinth, RCC Structure, Brikwork, Ext./ Int Plaster, Gutter Waterproofing, Site Development, Road and Tremix work of 60,000 Sqft.
Sr. No. | Particular | Company Name |
---|---|---|
1 | Construction of Food Outlet at Panvel | Shree Datta Snacks |
2 | Construction of UCR wall 500 Rmt length & Brickwork , Paverblocks, 20,000 sqft at Kalyan Birla college | Birla College, Kalyan |
3 | Construction of BOD (ETP) Plant | Construction of BOD (ETP) Plant |
4 | Interior Works including All Finishes. Flooring Granite Dado, False Ceiling, Carpentary, ACP, Plumbing Area of BSS Hall = 1400 M2 | Interior Work For Brahaman Sahayyak Sangh hall at Shivaji Park, Dadar. |
5 | Construction of factory bldg Gr+2nd floor Area- 8000 sqft | Construction of Factory Building |
6 | Foundations for Steel Structure, Height of the Steel Structure is 18 m. Total structural steel Fabrication of 50 MT. Size of Platform 12m x 12m at a Height of 18 m from ground. | Construction of Steel Structure For Supporting GRP Overhaed Watertank. (Capacity of Tank 1,60,000 Lit.) & Structural Repair work. |
7 | Area 6000 Sqft | Construction of Factory Building Dombivli |
8 | Area 10,000 Sqft | Construction of Suphala Plant at RCF, Chembur |
9 | Industrial Building of 2000 M2 Area, with Structural steel Fabricated Roof and Partly RCC Framed Structure. Period of Completion : 7 Months | Construction of CSY Plant and PSY Plant |
10 | Construction of 4500 M2 of RCC Road , using Vacuum dewatering method. Construction of Factory Sheds of 700 M2 with Tremix Flooring, Roofing Etc. complete. Period of Completion: 8 Months | Construction of Factory Buildings and Concrete roads using Vacuum Dewatering Method |
11 | Construction of 700 M2 of RCC Warehouse with RCC Slab at a Height of 6 m., including all electrical and firefighting works . Period of Completion : 9 months | Construction of Warehouse at IP-4, Borle, Panvel, |
12 | Construction of 3 Lab Buildings with Interior Fit outs. | Construction of Laboratory Building with interiors. |
13 | Construction of 3 storied Industrial Building, including part basement. Foundation of Building was part open and part Pile Foundation. Total area of Construction 1500 M2 Period of Completion : 8 Months | Construction of Industrial Building, at Wagle Estate, Thane. |
14 | Construction of UPS Bldg and Construction of MCC Bldg. Total area 700 M2.Period of Completion = 5 Months | Construction of Factory Building. |
15 | Cold storage with RCC foundations, Steel Framed structure and GI Precoated Roof, Tremix Flooring | Construction of Cold Storage |
16 | A Unique Project Work. An envelop of new Industrial Bldg. is constructed , keeping the old Industrial Bldg intact, without disturbing the Manufacturing activities. Plot Size: 40 m x 40 m. Once an envelope of New Industrial Building is ready, old industrial bldg is demolished. | Construction & Interior of Factory Building including Structural steel work. |
17 | Hospital Bldg Area = 2000 M2 | Construction of Hospital bldg for Ashray Trust. |
18 | Area of Showroom including Service Station = 4000 M2 | Construction of Showroom for RENAULT |
19 | Mid Size Bldg. Construction Work | Construction for Pharma Plants: Johnson & Johnson Mulund, Calyx Pharma, Orex Pharma. |
20 | Area of Hotel 8000 Sqft | Construction of Hotel, Dombivli |